IPS were called to attend a difficult to access freeze in the roof area at Beaufort House, Aldgate, by ZJ Building Services.
Work was required to enable replacement of an existing flow meter. Access was via a goods lift to the 11th floor, then all equipment needed to be manually carried up access stairs to the roof area. It certainly saves on the gym fees!
Beaufort House is a fully refurbished Grade A office building close to Aldgate and Liverpool Street stations, providing fully serviced and furnished offices.
IPS carried out 2 x 250mm freezes to the CHW mains, holding in place until the new meter was safely installed.
For your next pipe freezing, hot tapping or flow measurement project, call IPS on 020 8543 9390.
“I would definitely use IPS again. The whole process from initial enquiry to finished job was seamless. IPS were flexible and accommodating, even though we changed dates. Communications throughout were excellent. Once on-site the technicians were brilliant. Clean, tidy and professional. It was a joy to find a contractor so easy to work with.”JLA Group