We recently attended a factory in Coventry manufacturing innovative fuel tank systems using a blow moulding machine.
The machine was due for decommissioning but the flange mounted isolation valves had seized.
We established a double freeze isolation to a pair of 150mm, reducing to 125mm, cooling water main, enabling the engineers to drain out the water, change the valves and blank off.
Our client Christy Engineering Solutions, using us for the very first time, commented
"I was absolutely over the moon with your lads yesterday. They were brilliant, couldn't do enough to help us, working a long hot day up in the eves and staying to help beyond their actual job."
"I just wanted to say thank you for yesterday. Your team onsite were extremely helpful and professional throughout. The works were carried out smoothly, and the hospital were very impressed”. Southampton General Hospital - Datum Design and Build