IPS were called out by Gloster MEP to assist with pipework alterations to the sprinkler systems servicing Fulton & Fifth in Wembley.
This is a large mixed-use development with over 800 apartments and commercial spaces. It features five residential towers with community areas, a gym, swimming pool, cinema, and co-working spaces.
Alterations were required to the sprinkler system servicing the commercial areas. As the system was live, draining down wasn’t an option so we carried out a relatively straightforward freeze of the 4” sprinkler main.
The Mechanical Site Manager at Gloster MEP praised our technicians,
“The 2 engineers that you kindly sent to me were very punctual, came with the correct PPE, carried out the job without any fuss and kept the area clean. Their attitude towards me, the site and their job was amazing.
You are always my first point of contact when it comes to freezing and have always got the job done. “
We look forward to working with Gloster again soon.
"I would just like to say thank you to the IPS team for the work carried out at Croydon University Hospital today. As we all know there is always the potential for things not to go as planned but working within a live hospital environment can add that little extra to it. Once again IPS have carried out an excellent job in a planned calm manner which we truly appreciate. Please pass on our thanks to the lads and I'm sure we will speak soon." Megan Mechanical Services Ltd